Dreaming of a brand-new kitchen but dreading how long it will take? You're not alone!
A kitchen renovation is one of the most exciting home upgrades. However, it can consume a lot of time and effort without proper preparation. Whether you're planning a simple kitchen makeover. Or building a whole new custom-made kitchen in Perth. Knowing the realistic timeline & planning ahead can save you from unnecessary frustration.
Let’s guide you about the important steps and time they will take. So, you can start your kitchen renovation project with confidence.
At Master Tops, we offer premium stone benchtops for your Perth kitchen renovation. Our 20 years of experience help add a touch of elegance and durability to your space. Our durable and luxury benchtops can enhance your stylish kitchen renovation.
Let’s get started.
How Long Does a Kitchen Renovation Take? 10 Phases
A typical kitchen renovation takes anywhere from 6 to 14 weeks, depending on various factors such as:
The size of your kitchen
The complexity of the design
The availability of materials (such as stone benchtops)
Custom cabinetry and fixtures
Unforeseen issues (like plumbing or electrical upgrades)

To give you a clear idea. Here is each phase of a kitchen renovation explained along with the duration required for each step.
Planning, Research & Gathering Kitchen Renovation Ideas
Time Required: (1-4 Weeks)
The first step in any kitchen renovation is thorough planning and research. This phase can take anywhere from a single week to several months. Depending on how decisive you are and how much time you put in.
This phase involves:
• Identifying Your Needs:
Think about what your new kitchen should achieve. Are you looking for award winning kitchen designs or something practical and minimal? Do you need more storage or an open-plan layout?
• Setting a Budget:
The cost of a kitchen renovation Perth can vary greatly. Research different materials, labour costs, and unexpected expenses.
• Finding the Right Kitchen Makers
Look for kitchen makers in Perth who can bring your vision to life. Check reviews, visit showrooms, and ask for quotes.
• Gathering Inspiration:
Browse kitchen renovation ideas online, in magazines, or visit home improvement stores for inspiration.
A well-thought-out plan helps avoid delays later in the project.
Design Selection & Preparation
Time Required: (1-2 Week)
Once you’ve finalised your vision, it’s time to decide the design and prepare the workspace. This phase includes everything from choosing materials to preparing for the renovation work. Don’t make any decision without considering your space.
Steps in This Phase:
• Working with a Designer:
If you’re working with a kitchen maker. They will help you create a layout that maximises functionality and aesthetics.
• Choosing Materials:
This includes benchtops, cabinetry, appliances, flooring, splashbacks, and fixtures. You can choose granite, marble, or quartz benchtops for durability and style.
• Ordering Materials:
Some custom materials can take weeks or even months to arrive. It’s wise to check their availability and order before beginning the process.
Once the design is locked in and materials are ordered, it's time to start preparing the space.
Old Kitchen Demolition & Clearing
Time Required: (1 Week)
Now, it’s time to say goodbye to the old kitchen! Prepare the necessary permits (if required) and start clearing up the space. Demolition can take anywhere from a few days to two weeks, depending on the building design.
What Happens During Demolition?
• Removing old cabinets, countertops, and appliances
• Tearing down walls (if you’re changing the layout)
• Checking for hidden damage (such as mould, termite damage, or outdated wiring)
• Disposing of old materials responsibly
A clean and prepared space is essential before new installations begin.
Cleaning & Repairs
Time Required: (1-3 Days)
Once the old setup is removed. Clean up the space and arrange any necessary repairs or reinforcements. Time period can increase or decrease according to the damage and complexity of the fixes.
Common Repairs Include:
• Fixing damaged walls, floors, or ceilings
• Updating insulation and ventilation
• Preparing the space for new electrical and plumbing work
This step will result in a smooth installation ahead.
Custom Cabinetry & Benchtop Manufacturing
Time Required: (1-3 Weeks)
While your kitchen is being prepped, the cabinetry and benchtops are manufactured. If you want custom-made kitchens in Perth, this process can take a few weeks longer.
Why This Phase Takes Time?
• Custom cabinets require precise measurements, cutting, and assembly
• High-quality stone benchtops (like granite and quartz) need fabrication and finishing
• Some materials have long shipping times
At Master Tops, we deliver precision and quality craftsmanship in all our stone benchtops. So, your kitchen can be made beautiful and durable.
Plumbing & Electrical Work
Time Required: (3-10 Days)
Before new fixtures and cabinets are installed. Plumbing and electrical systems must be checked and any necessary updates must be made. So, you’ll not have to face any trouble in your newly renovated kitchen.
What Happens in This Phase?
• Installing new plumbing for sinks, dishwashers, and water filtration systems
• Upgrading electrical wiring for appliances, lighting, and outlets
• Repairing any damaged wires, sockets, boards, etc.
If you are relocating your sinks or electrical appliances. You’ll need to update the whole water & electric system and this step will take longer.
Plastering & Painting
Time Required: (1 Week)
Once plumbing and electrical work is done, plastering and painting can begin. So, you can hide the damages caused by pipework or electrical work. Choosing neutral tones helps create a timeless kitchen interior.
What’s Done in This Phase?
• Wall and ceiling repairs
• Applying primer and paint
• Creating a polished and finished look
Give your plaster proper time to dry up (2-5 days) before starting to add the layer of paint.
Kitchen Tiling & Flooring
Time Required: (1-2 Weeks)
New flooring and tiling are also necessary to bring the look of renovated kitchen together. Choose high-quality flooring in tones complimenting your cabinets & paint colours.
Steps in This Phase:
• Surface preparation
• Installing new flooring (timber, tiles, or hybrid flooring)
• Laying backsplash tiles
• Grout application
• Sealing and finishing
Flooring should be able to handle the foot traffic & moisture of the kitchen environment.
Kitchen Benchtop Installation
Time Required: (5-8 Days)
Benchtops are one of the most important elements of a kitchen. At Master Tops, we offer you high-quality stone benchtops. Including granite, marble, quartz, and porcelain.
Benchtop Installation Process:
• Measuring and cutting the stone
• Installing and securing the benchtop
• Polishing and sealing for longevity
A well-chosen stone benchtop can benefit you for years to come. It not only handles the spills but also gives a classic look to your kitchen.
Lighting & Final Touches
Time Required: (1-3 Days)
This phase includes lighting, cabinet hardware, and final inspections. Choose the suitable lighting and double-check all the components. If anything seems off, you still have time to redo it.
Final Steps Before Completion:
• Installing pendant lights, LED strips, and under-cabinet lighting
• Adding handles and knobs to cabinets
• A thorough clean-up and final walkthrough
Now, your dream kitchen is complete!
8 Tips to Avoid Delays in Your Kitchen Renovation
Follow these tips to enjoy a smooth process of kitchen renovation.
Plan ahead and make thoughtful decisions.
Search for Perth kitchen renovation costs 2025 to get a price estimate.
Keep your space and lifestyle in mind while deciding anything.
Hire experienced kitchen makers in Perth to help you out.
Order materials in advance to avoid delays or unavailability issues.
Prefer quality materials over cheap ones, you’ll not regret it.
Choose simple & affordable kitchen makeovers within your budget.
Have a backup budget for unexpected expenses
Looking for high-quality benchtops for your Kitchen Renovations Perth?
Start Your Stylish Kitchen Renovations with Master Tops
At Master Tops, we offer you high-quality stone benchtops. That are not visually appealing but also durable enough to handle your needs. Our classic designs can transform your kitchen into a luxury space.
Explore our range of granite, marble, and quartz benchtops. And start your kitchen renovation today!